Wednesday, October 27, 2021
Dear Owners/Residents,
Please be reminded that Accurate Power Group will be on site to conduct the electrical vault maintenance as mandated by BC Hydro tomorrow night.
POWER FOR THE ENTIRE BUILDING WILL BE SHUT OFF FROM 11:00 P.M, October 28th TO 4:00 A.M October 29th. THERE WILL BE NO POWER IN-SUITE.
The emergency generator will power emergency lights, the access control system, the main parkade gate and one elevator.
Unplug your electrical devices
Protect your electrical devices from damage. During an outage, unplug all electrical equipment and turn off items such as lights, heaters, and major appliances.
Thank you for your attention and cooperation with the above work and we apologize for any inconvenience.
See PDF attached
Comments